MoEP EU-Twinning

Looking forward - Looking back - A brief project update

Looking back
Looking forward
September/October 2016

- Mission on continuous stack monitoring with 2 experts from Germany

- 2 Missions on Environmental Management System (EMS) with 1 UK expert, 1 Austrian expert, writing of Manual

- Study visit to Northern Ireland Delegation including: Israeli MoEP professionals, environmental NGO, industry

- Mission on hazardous substances with 1 German expert

- Mission on energy efficiency with 1 German expert continuing the Manual

- Mission on continuous stack monitoring with 2 experts from Germany

- Mission on classification of hazardous waste with 2 Austrian experts

February/March 2017

- 2 Missions on VOC installations (print and plastic) with 2 German experts

- Mission on EMS with 2 Austrian experts

- Mission on Air Monitoring with 1 German expert

- Mission on Hazardous Waste with 1 Austrian and 1 German expert

- Preparatory mission on new TA Luft with 1 German expert

- 1 Mission on wastewater stream inventory with 1-2 German experts

- Mission on Visibility with 1 Austrian expert

- Mission on Hazardous Substances with 2 German experts

- Mission on Basel Convention (transboundary movement of waste) with 1 Austrian and 1 German experts

- Mission on waste reduction with 2 German experts

- Study visit to Germany

November 2016

− Mission on VOC installations (printing and plastic) with 2 German experts

− Mission on continuous stack monitoring with 2 experts from Germany with large scale workshop on continuous stack monitoring

− Mission on hazardous waste management 3 Austrian experts including discussion on sampling methods

− Mission on odor issues and GIRL (German Odor Ordinance)

− Mission on CWW (Common Wastewater and Waste Gas) BREF and wastewater stream inventory

− Mission on new TA Luft and BREF documents with 2 German experts

− Mission on Energy Efficiency with 1 German and 1 UK expert

− Mission on hazardous substances with 2 German experts

April 2017

- 1 Mission on LCP (large combustion plants) with 2 German experts

- 1 Mission on new TA Luft with 2-3 German experts

December/January 2016-2017

− 2 missions on VOC installations (printing and plastic), each with 2 German experts

− Mission on soil protection with 2 Austrian experts and finalization of manual

− Mission on stack monitoring, including site visit and workshop

− Mission on waste co-incineration, with 2 German experts, including high-level site visit to Nesher (Ramle) cement plant

− Mission on wastewater stream inventory

− 2 missions on hazardous substances, each with 2 German experts, including work on manual

May/June 2017

− 1 mission on VOC with 2 German experts

− 2 mission on visibility, one with German, one with Austrian expert

− 1 mission on soil protection with 2 Austrian experts

− 1 mission on hazardous substances with 3 German experts

− 1 mission on air monitoring with 1 German expert

− 1 mission on EMS with 2 Austrian experts

− 1 mission on waste reduction with 2 German experts

− 1 mission on UK permitting system with 1 UK expert

END OF PROJECT

Achieved Results

− Mission on continuous stack monitoring: completion of manual, round table discussion, large workshop, training with new manual, site visit

− Missions on EMS: finalization of Manual

− Study visit to Northern Ireland Delegation: study visit report with conclusions and recommendations

− Missions on hazardous substances: work on manual

− Mission on energy efficiency: finalization and publishing of manual

Planned Results

− Manuals on each topic

− Workshops

− Training and capacity building

− Recommendations

− Wrap-up event

Previous list: Looking forward - Looking back


backHome